Xinzheng Industrial Park,Qingyuan West Street,Weifang Economic Development Zone,Shandong,China
diesel generator  +86 15905360231    diesel generator  huaquan@huaquanpower.com
Current Location:HOME > 1200kva generator > In terms of the new diesel generating sets when using diesel engine >
In terms of the new diesel generating sets when using diesel engine
Update:2017-02-09 Tags:running

New or after overhaul biogas generator priceof the diesel engine, before the formal use must be approved by 60 h break-in, may be used in full load. To improve the working condition of all the moving parts of diesel engine, to improve the operation reliability and service life of diesel engine. Diesel engine during running-in load with 50 ~ 80% advisable, speed should be not greater than 80% of the calibration speed as well. But in the beginning of running-in stage idle running or small load cases operation time shoulds not be too long.

When replacement of cylinder liner, piston, piston rings, connecting rod bearing shell and crank should also be conducted in accordance with the working condition of the running-in after short-term bond.

Also should pay attention to during running-in and don't make long run diesel engine at idle speed condition.

Copyright Weifang Huaquan Power Machinery Co.,Ltd
Powered by Huaquan